2026 Boca Raton planning guide

What does a kitchen remodel cost?

Realistic budget tiers, the choices that move costs, and a better sequence for planning a refined South Florida kitchen.

Updated August 20268-minute readFlorida CGC1541050
Completed custom kitchen and dining renovation in Boca Raton

A kitchen budget is shaped less by room size than by cabinetry, appliances, stone, layout, building systems, and the level of integration with adjoining spaces.

The ranges below are feasibility tools—not bids. Property logistics, structural work, premium products, and concealed conditions may require different budgets and schedules.

Early feasibility

2026 Boca Raton kitchen remodeling ranges

Project levelPlanning rangeTypical scope
Focused kitchen updateApproximately $25,000–$35,000

Keep the general layout; update selected cabinetry or fronts, counters, backsplash, fixtures, lighting, paint, and finishes.

Full kitchen remodelApproximately $35,000–$80,000

New cabinetry, counters, appliances, lighting, flooring, plumbing and electrical work, with selected layout changes.

Luxury or custom kitchenApproximately $80,000–$150,000+

Custom millwork, premium appliances and stone, structural or major layout changes, specialty lighting, integrated systems, and adjoining-space work.

Important: These broad South Florida planning ranges are educational, not quotations. The property, plans, selections, quantities, permits, and scope determine pricing.

Where the budget moves

Six major kitchen cost drivers

01

Cabinetry and millwork

Door style, material, interior accessories, integrated panels, custom finishes, installation complexity, and lead time.

02

Appliances

Premium refrigeration, cooking, ventilation, wine storage, panel-ready units, electrical requirements, and appliance-specific cabinetry.

03

Stone and surfaces

Slab selection, thickness, edge details, waterfall ends, backsplash, seams, fabrication, and installation access.

04

Layout and structure

Moving walls or openings, relocating sinks or gas, changing ceilings, and connecting the kitchen to adjoining living areas.

05

Building systems

Electrical capacity, circuits, lighting controls, ventilation, water, drainage, gas, and code-required upgrades.

06

Existing conditions

Moisture, outdated wiring or plumbing, uneven floors, prior work, concealed damage, and discoveries after demolition.

Luxury South Florida kitchen concept with custom cabinetry and stone island
Concept image: premium appliances, integrated cabinetry, specialty surfaces, and detailed lighting require early coordination.

Design through completion

Plan the full timeline—not only construction.

Design and selections2–4 weeks
Engineering and permitting2–4 weeks
Cabinetry and procurement3–6 weeks
Typical complete-kitchen construction6–10 weeks

Phases can overlap. Custom products, municipal review, HOA requirements, revisions, and existing conditions can extend the schedule.

Permit planning

Resolve approvals before demolition.

Electrical, plumbing, mechanical, gas, structural, and opening work may require permits and inspections. Identify applicable requirements before construction.

City permit information

Preconstruction essentials

Decisions to make before final pricing

  1. 01

    Confirm the layout

    Document walls, openings, island, appliances, clearances, seating, storage, and adjoining rooms.

  2. 02

    Select appliances early

    Exact specifications coordinate cabinetry, ventilation, electrical, plumbing, gas, and countertops.

  3. 03

    Define finishes

    Establish cabinetry, hardware, stone, backsplash, fixtures, lighting, and flooring.

  4. 04

    Compare complete proposals

    Review scope, allowances, exclusions, permits, protection, supervision, schedule, and change orders.

Completed Boca Raton open-plan renovation

More than one room

See a complete transformation.

Tour a Boca Raton renovation and see how the kitchen connects with living, dining, exterior, and pool spaces.

View the case study

Frequently asked questions

Before planning your kitchen.

How much does a kitchen remodel cost in Boca Raton?

A full kitchen remodel may use an early planning range of approximately $35,000–$80,000. Luxury or custom kitchens with premium cabinetry, appliances and stone, structural work, or adjoining-space renovations may reach approximately $80,000–$150,000 or more. A defined scope is required for pricing.

How long does a complete kitchen remodel take?

Typical complete-kitchen construction may take approximately 6–10 weeks. Design and selections, engineering and permitting, and cabinetry procurement take place before or alongside construction planning.

Do kitchen remodels require permits in Boca Raton?

Permits commonly apply when electrical, plumbing, mechanical, gas, structural, or opening work is involved. Requirements should be confirmed for the property and scope.

Should appliances be selected before cabinets?

Yes, whenever possible. Appliance specifications affect cabinetry openings, panels, electrical, plumbing, gas, ventilation, clearances, and countertops.

About these estimates

Cost and schedule information is educational, not a bid, contract, appraisal, or guarantee. Obtain a written project-specific proposal based on the property, plans, selections, and scope.

Plan the complete kitchen

Ready to discuss your Boca Raton remodel?

+1 561 777 0790contact@themilestonellc.com
Request a consultation
Call nowRequest consultation